STAGE 3 · STATPORT MES · TOTAL PRODUCTIVITY
1.8–2.0% OEE gain.
Every month.
Plans, constraints, losses and yield in one live view, across every work centre and site. See the bottleneck, act on it, and watch OEE move.

WHAT IT DOES
Plan, see, measure, recover.
01
Plans & Constraints
Integrate with ERP to track costs
Capture constraints in real time
Re-prioritise and reallocate fast
Monitor plan vs actuals live
Track variable costs with IoT
02
Visibility
Real-time visibility across sites
Every work centre and process
Digital job cards & route cards
Spot and resolve bottlenecks
Traceability search engine
03
OEE & OLE
Pinpoint cycle time losses
Track and resolve every loss
Map to availability & performance
Capture quality via IoT
Holistic OEE: AR, PR, QR
04
Yield
Integrate material feeds
Automate BoM checks with ERP
Track common process losses
Flag abnormal consumption
Monitor yield in real time
