ROI CALCULATOR

Know the return
before you begin.

Estimate year-1 value for your plant from two sources: recovered production and going paperless. Start with your revenue and OEE; open the assumptions to fine-tune.

ROI calculator

01 · Production recovery

Your plant

Recovering OEE points turns lost capacity into margin.

₹ Cr
%
points
Margin assumptions
% of revenue
% of revenue

02 · Paperless digitalisation

Your paper

Every paper check sheet costs far more than print and file over its life.

sheets
%
Paper lifecycle assumptions

Rates

templates
₹ / hour
₹ / hour
₹ / hour
₹ / hour

Per sheet

₹ / sheet
min / sheet
₹ / sheet
%
hours

Templates

hours
years
per year
hours
sup. hours
per year
hours
hours / year
templates
variants
per year
hours

Cost of failure (shown, not counted in year-1 value)

per 1,000 sheets
₹
₹

VALUE BY STATION

Where the value comes from.

Your estimate, traced to the stations of one plant day. The figures follow the calculator above.

Share of your year-1 value

  • Performance –
  • Paperless –
  • Availability –
  • Quality –

01 · Production recovery

Losses recovered, station by station

––
Availability––
  • Batch setupFrom setup by habit to best practice on every work centre and variant
  • First part & setup approvalFrom waiting for sign-off to automated approvals that start every batch on time
  • Condition monitoringFrom breakdown to preventive, and from preventive to predictive
  • Asset life & maintenanceFrom repairing downtime to preventing it
Performance––
  • Production patrolFrom subjective rounds to a system that flags the events that matter
  • Process monitoringFrom readings logged later to inputs captured while the context is fresh
  • Production losses → resolutionFrom losses reported to all 23 traced to their drivers and closed
Quality––
  • Quality patrolFrom separate checks to shop-floor inputs and machine data together, true IT–OT convergence
  • End of line pre-dispatch checkFrom paper checklists to customer-specific checks for every variant and shift, fully traceable
  • Yield & material lossesFrom treating every loss alike to early flags on the ones that matter
  • Quality losses → CAPAFrom repeat defects to root causes found with 4M and fixes that hold

02 · Paperless digitalisation

What each paper sheet really costs

––
  • Cost elementPer sheetYear-1 saving
  • Print, fill and file––
  • Transcription, review and reporting––
  • Archive over retention life––
  • Template change control––
  • Record retrieval––
  • Product variant updates––
  • Compliance audits––
  • Template design––

Paper leaves every check sheet and log in the plant day: setup approval, production and quality patrols, process monitoring and the end-of-line check.

03 · Further upside

Value we leave out of the estimate

PlanningDemand & planning · Plan priorities & allocations

From infinite-capacity plans to plans built on real constraints, moving toward the best achievable plan.

Batch costBatch cost

From theoretical costing to real cost at the end of every batch or shift, built from all 23 losses.

Cost of paper failures–

Errors and delayed recovery from paper records. Left out so nothing is counted twice.

Production recovery is split by a typical plant’s loss profile. Your plant’s own data sets the real split.

HOW IT IS CALCULATED

Two sources of value.

01

Production recovery

One OEE point is worth revenue ÷ (OEE × 100). If the plant can sell more, each point earns contribution margin; if demand is fixed, it saves conversion cost.

02

Paperless digitalisation

A paper sheet’s lifecycle cost adds template design, change control, audits, variants, transcription, archive and retrieval to its direct cost. Savings apply to the share of paper eliminated.

03

No double counting

Cost of failure and delayed recovery are shown for context but left out of paper savings, because scrap and rework recovery are already counted in production.

All figures are illustrative assumptions by Data Sakshi, not measured plant data. Want an estimate built from your plant’s own records? Contact the team.